The SGPE inverter offers superior quality true sine wave power ,it is designed to operate various of power tools and inductive loads,The AC output waveform is even better than the power supplied by your utility.
performance advantage
CERTIFICATE and PACKING
FACTORY DETAIL AND FAIR
FAQ
1. What is your lead time? It is 3-5 working days for sample and 25-30 working days for batch order. 2.What is your payment terms? Our payment term is 30% in advance and balance paid before shipment. 3.How does your inverter guarantee? Each SUG New Energy pure sine wave inverter has a 2-year warranty, and each SUG New Energy modified sine wave inverter has a l-year warranty; During the warranty period,the inverter can be repaired free of charge, except for damage caused by man-made reasons; After the warranty period expires, the inverter can be repaired for a fee if there is a fault or quality problem.Please contact the customer service for details of the repair cost.
4.How to calculate the inverter working hours? The use time of the inverter depends on the battery power and the power of the load.You can refer to the following formula: Working time = DC voltage x battery capacity x08 (battery discharge rate) x09 (in- verter conversion efficiency)/load power For example: 1 12V100AH battery drives 1 100W motor through the inverter Working time=12Vx100AHx08x0.9/100W=8.64 hours